Data Loading...

10 East 53rd Tourbook

316 Views
157 Downloads
2.56 MB

Twitter Facebook LinkedIn Copy link

DOWNLOAD PDF

REPORT DMCA

RECOMMEND FLIP-BOOKS

10 East 53rd Tourbook

BUILDING ENTRANCE

BUILDING LOBBY

PENTHOUSE/37 36 35 34 33

STACKING PLAN

32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12

11

10

9 8 7 6 5 4 3 2

Available

PREBUILD

PREBUILD PANTRY

ELEVATOR LOBBY

SAMPLE TENANT BUILDOUT

SAMPLE TENANT BUILDOUT

SAMPLE TENANT BUILDOUT

BATHROOMS

SUITE 1200 — 2,742 RSF EXISTING CONDITIONS

FLOOR KEY: Tota l Of f i ces Workstat ions

2

12

Conference Rooms

1 1

UP

Pant ry

DN

UP

DN

Tota l Personne l

14

Click here for more information

SUITE 1801 — 3,058 RSF EXISTING CONDITIONS

FLOOR KEY: Tota l Of f i ces Workstat ions

2

11

Conference Rooms

1 1 1

Recept ioni st

Pant ry

Tota l Personne l

14

Click here for more information

23RD FLOOR - 8,454 RSF EXISTING CONDITIONS FURNISHED

UP

DN

UP

DN

FLOOR KEY: Tota l Of f i ces Workstat ions

10 33

Conference Rooms

2 2 1 1

Breakout Rooms

Recept ioni st

Pant ry

Tota l Personne l

44

Click here for more information

ENTIRE 24TH FLOOR — 8,339 RSF PROPOSED LAYOUT

FLOOR KEY: Tota l Of f i ces Workstat ions

9

13

Conference Rooms

2 1 ?

Recept ioni st

Tota l Personne l

Click here for more information

TYPICAL TOWER FLOOR - 8,925 RSF OPEN LAYOUT

TYPICAL TOWER FLOOR — 8,925 RSF

OPEN PLAN LAYOUT

CAFE

FLOOR KEY: Pr i vate Ofces

4

Workstat ions

59

Recept ioni st

1

Conference Rooms

2

Café

1

Copy/Pr int Areas

1

Server

1

Total Personne l

64

Click here for more information

TYPICAL TOWER FLOOR - 8,925 RSF OFFICE INTENSIVE LAYOUT - OPTION 1

TYPICAL TOWER FLOOR — 8,925 RSF

OFFICE INTENSIVE LAYOUT - OPTION 1

CAFE

FLOOR KEY: Pr i vate Ofces

13

Workstat ions

16

Recept ioni st

1

Conference Rooms

2

Café

1

Copy/Pr int Areas

1

Server Room

1

Total Personne l

30

Click here for more information

TYPICAL TOWER FLOOR - 8,925 RSF OFFICE INTENSIVE LAYOUT - OPTION 2

TYPICAL TOWER FLOOR — 8,925 RSF

OFFICE INTENSIVE LAYOUT - OPTION 2

CAFE

FLOOR KEY: Pr i vate Ofces

13

Workstat ions

27

Recept ioni st

1

Conference Rooms

2

Café

1

Copy/Pr int Areas

1

IT Room

1

Total Personne l

41

Click here for more information

NEIGHBORHOOD MAP

CLUBS AND ASSOCIATIONS RESTAURANTS/MARKETS HOTELS RETAIL

BUILDING SPECIFICATIONS

location

Entrances on both 52nd and 53rd Streets between Madison and Fifth Avenue

year built

1971

architect

Emery Roth & Sons

building size

392,849

building height

Thirty-seven (37) Floors

building construction

Structural steel frame construction, comprised of columns, girders and beams encased in concrete The facade is a curtain wall system of bronze duranotic aluminummullions and spandrel panels with tinted glass A recently completed building wide $50M redevelopment includes the following: • New lobby integrated with dramatic interior arcade • New plazas with abundant green space • New elevator cabs • New windows • Upgrades to building infrastructure • New first class bathrooms

floor sizes

Floor 2 Floor 3

9,921 rsf 11,997 rsf 16,406 rsf

Floors 4-9

Floors 11-37

8,462-8,926 rsf

floor load

50 pounds per square foot

typical slab heights

11’ 6”

column spacing

21’ on center

elevators

Nine (9) passenger cars, one (1) freight elevator car Loading dock located on 52nd Street side of the building

hvac / supplemental

The building HVAC system is a central chilled water plant with constant volume The fan system consists of two (2) 650 ton York high pressure steam paraflow absorbers Perimeter steam heat supplied from Con Edison Operating hours are Monday-Friday 8:00 AM - 8:00 PM

cooling

electric

The building is fed by two (2) Con Edison feeds from an electrical vault on 53rd Street Approximately six (6) watts per square foot (exclusive of base building HVAC) is allocated for tenant use

life / safety

• Class E fire alarm system (Notifier CPU2-3030D) • The systemmonitors heat sensitive sprinkler heads, tamper and flow devices, smoke detectors, smoke trip devices, alarm and strobe devices, stairwell pressurization fans, and elevator recall and door releases • The system also has communication capabilities and is tied into the PA System and warden phones are provided at the passenger elevator lobbies throughout the building and also at the freight elevator lobby

security / access

The building security desk is manned 24 hours a day, 7 days a week Turnstiles with access cards for tenants in the lobby CCTV surveillance in public areas and all elevators

telecom / cable

Altice, AT&T, Cogent, Crown Castle Fiber, Extenet Sytems, Pilot FIber, and Spectrum Business Wired Certified Platinum, DAS

transportation

The building is located in close proximately to the 6,E,M,B,D and F subway lines

amenities

Equinox “E Club” and Blue Bottle Coffee located in building Landscaped public seating adjacent to both 53rd and 52nd Street entrances to the building

SUSTAINABILITY AT SL GREEN

HIGHLIGHTS

AIR • HVAC systems are equipped with MERV-15 media filters that capture airborne particles, exceeding the requirements of New York City’s Energy Code. • Mechanical systems increase the supply of outdoor air and continuously cycle fresh, filtered air throughout the building. • Base building air quality is assured by WellStat, a monitoring system that provides real-time air quality levels that measure indicators including carbon dioxide, particulate matter, VOCs, temperature, humidity, and more. • Building staff are required to use low VOC emitting products including solvents, carpets, adhesives, paints, and coatings to maintain optimal indoor air quality. BUILDING HEALTH & SAFETY • 10 East 53rd Street is WELL Health-Safety Rated, under an evidence-based, third-party verification of the effectiveness of our operational and maintenance protocols. • Janitorial staff conduct high frequency cleaning and sanitization using green cleaning products. • Construction materials used at 10 East 53rd Street are LEED-compliant, recycled, responsibly sourced, and non-toxic. • SL Green provides training on emergency preparedness and workplace safety to building occupants and coordinates response drills quarterly. ENERGY • 10 East 53rd Street is equipped with automated control systems. • LED lighting systems are installed throughout building common areas to increase energy efficiency. • SL Green’s Engineering team uses a real-time energy management platform (iES EnergyDesk) to monitor energy use in 15-minute intervals and respond to building conditions promptly. • SL Green invests in capital upgrades and commissions building systems to ensure they are maximining performance. RECYCLING • 10 East 53rd Street deploys a color-coordinated recycling procedure to minimize waste sent to landfills. • We conduct annual waste audits to identify areas for waste diversion improvement and develop corrective action plans. • We offer free recycling training sessions to tenants. • Janitorial staff uses double-barrel waste bins to ensure waste streams remain separated and are trained annually to maintain recycling best practices. • We offer complimentary e-waste pick-up to tenants to ensure materials are properly recycled. WATER • Existing toilets, urinals, faucets, and showers have been upgraded with low-flow fixtures, performing 20% above code requirements for water conservation. • Building engineers review water logs daily to compare trends and identify potential water loss. • SL Green disinfects cooling towers twice a year and conducts testing for legionella bacteria every 90 days.

SUSTAINABILITY AT SL GREEN

BUILDING ACHIEVEMENTS

TENANT PARTNERSHIPS

We support tenant sustainability reporting through >Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25

Made with FlippingBook Annual report