Data Loading...
11 Madison Tourbook
3 Downloads
11.07 MB
Twitter Facebook LinkedIn Copy link
RECOMMEND FLIP-BOOKS
NEIGHBORHOOD AERIAL
LOBBY
LOBBY
BUILDING ENTRANCE
BATHROOM RENDERING
S #4 | NY, NY | T 212.679.7729 | LBARCH.COM ROOM STANDARDS | RENDERING
SL GR 485
BATHROOM FINISHES
FINISHES
PORCELAIN FLOOR TILE: GARDEN STATE TILE SANDS IN GREY SAND, 12” X 24”
CERAMIC WALL TILE: NEMO TILE LIGHT IN GLOSS WHITE, 8” X 20”
VANITY ACCENT TILE: AKDO CARRARA 1” X 4” HERRINGBONE
COUNTERTOP: CAESARSTONE 2003 CONCRETE
PARTITIONS: HADRIAN CEILING HUNG METAL PARTITIONS IN POWDER COATED EXTRA WHITE
LIGHT FIXTURES
CEILING TILE | ARMSTRONG OPTIMA TEGULAR #3251 WITH 9/16" WIDE SILHOUETTE GRID 1/8" REVEAL.
LED TAPE LIGHT BEHIND MIRROR AT VANITY | CUSTOM BUILT, 6” STANDOFF, JESCO LED FLEXIBLE TAPE LIGHT
TRIMMED DOWNLIGHT IN TILE | FOCAL POINT ID+ 4.5" X 4.5" LED DOWNLIGHT
COVE OVER WATER CLOSETS | FOCAL POINT TRACE LED SLOT - FTRL-AC-LL1-35K -1C-LD1-G-SS-WH
LB ARCHITECTS 118 W22ND ST, #4 | NY, NY | T 212.679.7729 | LBARCH.COM PROPOSED BATHROOM STANDARDS | FINISHES
APRIL 2017
SL GREEN REALTY CORP. 485 LEXINGTON AVENUE
FAUCET | SLOAN BASYS SENSOR FAUCET
SOAP DISPENSER | SLOAN AUTOMATIC SOAP DISPENSER
TOILET | SLOAN ECOS TOILET AND FLUSHOMETER
LAVATORY |TOTO UNDERMOUNT SINK
URINAL | SLOAN STANDARD URINAL AND ECOS FLUSHOMETER
POWER TOWEL DISPENSER/TRASH | BOBRICK TRIMLINE SERIES B-39003 (ST. ST. FINISH)
NAPKIN DISPENSER| BOBRICK SURFACE MOUNTED B-3706 25 (ST. ST. FINISH)
SEAT COVER, TISSUE, NAPKIN DISPOSAL UNIT| BOBRICK B-3571 (ST. ST. FINISH)
MULTI-ROLL TISSUE DISPENSER | BOBRICK B-2888 (ST. ST. FINISH)
NAPKIN DISPOSAL | BOBRICK B-254 (ST. ST. FINISH)
SEAT COVER DISPENSER | BOBRICK B-221 (ST. ST. FINISH)
LB ARCHITECTS 118 W22ND ST, #4 | NY, NY | T 212.679.7729 | LBARCH.COM PROPOSED BATHROOM STANDARDS | FIXTURE/ACCESSORIES
APRIL 2017
SL GREEN REALTY CORP. 485 LEXINGTON AVENUE
STACKING PLAN
22 23 24 25 26 27 28 29
4,376 rsf 48,068 rsf 49,472 rsf 49,532 rsf 48,282 rsf 48,282 rsf 48,738 rsf 60,710 rsf 60,716 rsf
21
17 18 19 20
74,600 rsf 74,391 rsf 72,378 rsf 73,626 rsf 73,558 rsf 18,012 rsf 82,390 rsf 82,812 rsf
16
10 11 12 13 14 15
AVAILABLE 6/1/2022
99,556 rsf 98,420 rsf 98,420 rsf 98,391 rsf
7 8 9
103,630 rsf 103,630 rsf 103,630 rsf 103,662 rsf 103,662 rsf 87,482 rsf
6
4 5
3
2
77,965 rsf 21,421 rsf 28,337 rsf 73,697 rsf 90,964 rsf 22,831 rsf 26,718 rsf
Basement 4 Basement 3 Basement 2 Basement 1 Ground Mezzaine
TERRACE
13TH FLOOR
Artist Rendering
EXISTING CONDITIONS
13TH FLOOR - 82,812 RSF
EAST 25TH STREET
UP
UP
UP
UP
C/D #2
ELEC. CL #3 (N.E.)
F.A.C/D
C/D #1
ELEC. CL #1 (N.W.)
P.E. 45
S.E. 55
P.E. 46
CONV. SHAFT
STAIR P
FAN ROOM #1
S.E. 53
P.E. 43
P.E. 44
P.E. 64
P.E. 63
S.E. 80
STAIR Mn
FAN ROOM #2
ELEVATOR BANK B
P.E. 42
P.E. 41
P.E. 14
P.E. 16
P.E. 18
P.E. 52
P.E. 51
P.E. 62
P.E. 61
STAIR Q
ELEVATOR BANK F
ELEC. CL#2. (S.W.)
P.E. 40
P.E. 39
P.E. 50
P.E. 49
P.E. 60
P.E. 59
STAIR Ms
P.E. 17
P.E. 13
P.E. 15
P.E. 48
P.E. 37
P.E. 38
P.E. 47
P.E. 58
P.E. 57
ELELC. CL #4 (S.E.)
J. CL. #1
C/D #3
UP
UP
UP
UP
UP
UP
EAST 24TH STREET
SPACE KEY
Total Offices
23
Conference Rooms 6 Breakout/Phone Rooms 25 Workstations 515 Reception 1 Total Staff 538 RSF/head
153 RSF
Click here for more information
OFFICE INTENSIVE TEST FIT
13TH FLOOR - 82,812 RSF
EAST 25TH STREET
ROOF BELOW
ROOF BELOW
CAFE/LOUNGE
ELEC. CL #3.
C/D #2
STOR.
COPY/ MAIL ROOM
VEST.
WOMEN #2
ELEC. CL #1
C/D #1
VEST.
WELLNESS
FAN ROOM #2
FAN ROOM #1
J. CL #2.
S.E.55
MEN #1
S.E.45
S.E.46
PANTRY
STAIR "P"
MEN #2
VEST.
P.E.53
P.E.43
P.E.44
P.E.64
P.E.63
S.E. 80
STAIR "Mn"
CAFE STORAGE
P.E.61
P.E.52
P.E.41
P.E.42
P.E.62
P.E.51
P.E.14
P.E.16
P.E.18
STORAGE
ELEVATOR LOBBY
ELEV. BANK "F"
SERVER ROOM
ELEC. CL #2.
P.E.40
P.E.59
P.E.39
P.E.49
P.E.60
P.E.50
WOMEN #1
COPY ROOM
VEST.
STAIR "Q"
P.E.13
P.E.15
P.E.17
P.E.58
P.E.57
P.E.37
P.E.47
P.E.38
P.E.48
ELEC. CL #4.
J. CL. #1
STAIR "Ms"
C/D #3
PANTRY
PANTRY
COATS
ROOF BELOW
EAST 24TH STREET
SPACE KEY
Total Offices
34 21
Conference Rooms
Training Rooms
2
Workstations
316
Reception
1 3 1
Pantry
Cafe
Total Staff
405
RSF/head
204 RSF
Click here for more information
OPEN INTENSIVE TEST FIT
13TH FLOOR - 82,812 RSF
EAST 25TH STREET
PRIVATE OFFICE
PRIVATE OFFICE
PRIVATE OFFICE
PRIVATE OFFICE
PRIVATE OFFICE
PRIVATE OFFICE
PRIVATE OFFICE
PRIVATE OFFICE
ROOF BELOW
CAFE/LOUNGE
ELEC. CL #3.
C/D #2
COPY/ MAIL ROOM
VEST.
WOMEN #2
ELEC. CL #1
C/D #1
VEST.
WELLNESS
FAN ROOM #2
FAN ROOM #1
J. CL #2.
S.E.55
MEN #1
S.E.45
S.E.46
PANTRY
STAIR "P"
MEN #2
VEST.
P.E.53
P.E.44
P.E.43
P.E.64
P.E.63
S.E. 80
STAIR "Mn"
CAFE STORAGE
P.E.61
P.E.52
P.E.42
P.E.41
P.E.62
P.E.51
P.E.14
P.E.16
P.E.18
STORAGE
ELEVATOR LOBBY
ELEV. BANK "F"
SERVER ROOM
ELEC. CL #2.
P.E.40
P.E.59
P.E.49
P.E.39
P.E.60
P.E.50
WOMEN #1
COPY ROOM
VEST.
P.E.13
P.E.15
P.E.17
STAIR "Q"
P.E.58
P.E.57
P.E.38
P.E.37
P.E.47
P.E.48
ELEC. CL #4.
J. CL. #1
STAIR "Ms"
C/D #3
PANTRY
14 PPL CONF
ROOF BELOW
EAST 24TH STREET
SPACE KEY
Total Offices
32 17
Conference Rooms
Training Rooms
2
Workstations
474
Reception
2
Total Staff
506
RSF/head
163 RSF
Click here for more information
MULTI-TENANT TEST FIT
13TH FLOOR - 82,812 RSF
UNIT A - 39,897 RSF
EAST 25TH STREET
ROOF BELOW
ROOF BELOW
CAFE/LOUNGE
CAFE/LOUNGE
ELEC. CL #3.
C/D #2
STORAGE
PH. RM.
MAIL/ COPY
VEST.
WOMEN #2
ELEC. CL #1
C/D #1
FREIGHT
VEST.
SERVER ROOM
WELLNESS
FAN ROOM #2
FAN ROOM #1
J. CL #2.
S.E.55
MEN #1
S.E.45
S.E.46
MAIL/ COPY
STAIR "P"
MEN #2
VEST.
P.E.53
P.E.43
P.E.64
P.E.44
P.E.63
S.E. 80
STAIR "Mn"
P.E.62
P.E.41
P.E.61
P.E.52
P.E.42
P.E.51
P.E.14
P.E.16
P.E.18
STORAGE
ELEVATOR LOBBY 'A'
ELEVATOR LOBBY 'B'
ELEV. BANK "F"
SERVER ROOM
ELEC. CL #2.
P.E.59
P.E.40
P.E.60
P.E.49
P.E.39
P.E.50
WOMEN #1
VEST.
STAIR "Q"
P.E.13
P.E.15
P.E.17
P.E.58
P.E.57
P.E.47
P.E.38
P.E.37
P.E.48
ELEC. CL #4.
J. CL. #1
STAIR "Ms"
C/D #3
PANTRY
STORAGE
PANTRY
RECEPTION/LOUNGE
ROOF BELOW
EAST 24TH STREET
UNIT B - 42,916 RSF
UNIT A
UNIT B
Total Offices
28 10
Total Offices
28 10
Conference Rooms
Conference Rooms
Break Rooms Workstations
4
Break Rooms Workstations
3
193
208
Reception
2
Reception
2
Total Staff
223
Total Staff
238
RSF/head
178 RSF
RSF/head
180 RSF
Click here for more information
CORE AND SHELL
13TH FLOOR - 82,812 RSF
EAST 25TH STREET
EAST 24TH STREET
SPACE KEY
Total Offices
73 10 19
Conference Rooms Breakout Rooms
Workstations
422
Reception
1
Total Staff
496
RSF/head 200 RSF Click here for more information Click here for more information
15TH FLOOR
15TH FLOOR
15TH FLOOR
SUITE C
PARTIAL 15TH FLOOR - 7,147 RSF
EAST 25TH STREET
EAST 24TH STREET
SPACE KEY
Total Offices
3 4 2 8 1
Conference Rooms Breakout Rooms
Workstations
Reception
Total Staff
12
Click here for more information
TENANT BUILDOUTS
BUILDING SPECIFICATIONS
Owner: SL Green Realty Corp.
Security: Coordinated program of controlled electronic access (turnstiles with key-card access). Electronic surveillance and uniformed security guards on a 24/7 basis.
Location: Madison Avenue and Park Avenue South, Between 24 th and 25 th Streets
Loading Dock: Six loading bays accessed from 25th street. The loading bays offer direct access to the service elevators.
Year Built: Phased: 1932 - 1950
Architect: D. Everett Ward and Harvey Wiley Corbett
Elevators/Escalator:
« Six escalators run between the lobby and B2. « 41 passenger elevators and five freight elevators.
Building Size: 2,310,056 rentable square feet
Building Height: 31 stories above ground 4 stories below ground
Electric Capacity: 6 watts per square foot.6 vaults and five KVA transformers. 5 transformers provide service to 6 switchboards adjacent to vaults in level 1B.
Floor Sizes:
Generator: Caterpillar 1750 KVA generator supports base building life safety.
4B
3B
26,718
22,831
2B
1B
90,964
73,697
Floor Loads:
1
1M
28,337
21,421
« Lobby and Loading Dock: 120 pounds per square foot « Rest of Property: 80 pounds per square foot
2
3
77,965
87,482
4
5
103,662
13,662
Telecom:
6
7
103,630
103,630
8
9
103,360
98,391
Carrier
Services
Point Of Entry
Point Of Service
10
11
98,420
98,420
AT&T Fiber
Lines & Phone/>Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29
Made with FlippingBook Learn more on our blog