Data Loading...

2022 BMWC - Critical Dates

217 Views
36 Downloads
95.38 KB

Twitter Facebook LinkedIn Copy link

DOWNLOAD PDF

REPORT DMCA

RECOMMEND FLIP-BOOKS

2022 BMWC - Critical Dates

Critical Dates V3.21.22

5/31 Tue 6/13 Mon 7/14 Thur

Construction compound build out @Winterthur

Construction begins

Last day for carts on South Course Last day for guest play on South Course

7/30 Sat 8/1 Mon

Octagon/BMW arrives-occupy squash lounge Construction of gate 1 (temp. Tee for North Course no. 6) Construction of merchandise floor (limited range tee usage) Office trailer installation begins Fencing installation begins Construction of pool videos screen scaffolding Merchandise tent erected (limited range tee usage) Display flooring at driving range begins (limited range tee usage)

8/4 Thur

8/6 Sat 8/7 Sun

Last day of South Course member play Last day of Family Center usage Family Center set & occupied by WGA staff

8/8 Mon 8/9 Tue 8/10 Wed

PGA TOUR rules, agronomy, & NBA/Golf Channel arrive

Last day of Driving Range operation Media center & vhq carpet installation-indoor tennis courts 1 & 4 closed

8/11 Thur

ShotLink trucks arrive (occupy maintenance parking lot) Scoreboard installation (staff lot occupied for the day)

8/13 Sat

WCC Member Party Last day of Pool and Tennis operation Last day of North Course member play Last day of Locker Room access for members Last day of Bag Room access for members

8/14 Sun 8/15-8/21 8/16 Tue 8/14-8/21 8/16-8/21 8/22 Mon 8/23 Tue

Pro shop empty and turned over

See schedule of events

Clubhouse hospitality venues furnishings set

Security in place – mandatory parking & credentialing regulations

Kirk Road closure in place (6:00am-7:00pm)

BMW outing

Pro shop & bag room returned to WCC – facilities clear North Course open for member play Locker Room access resumes Fitness Center access resumes Pool access resumes Tennis access resumes (not including indoor courts #1 and #4)

8/24 Wed 8/25 Thur

Food and Beverage operation resumes Indoor courts #1 and #4 resume operation South Course open for play Driving Range tee re-opens (limited use) Course Cleared of all construction materials Tournament Headquarters furniture removed

9/21 Wed

9/30 Fri