Data Loading...
PPA | 29 Station Road, Backwell, BS48 3NH
52 Downloads
7.61 MB
Twitter Facebook LinkedIn Copy link
RECOMMEND FLIP-BOOKS
professional planning appraisal PPA
PROPERTY APPRAISED
29 Station Road Backwell BS48 3NH
DATE OF APPRAISAL
November 2019
hollismorgan
| auctions
residential sales
residential sales | auctions | the property cycle
THE PROPERTY CYCLE BUY AT AUCTION , BUILD OR REFURBISH . SELL WITH OUR RESIDENTIAL SALES TEAM . REPEAT THE CYCLE .
BUY
BUILD
REPEAT
SELL
“ …our aim is to be the number one new homes agent in the city for small/medium size developments… CALUM MELHUISH
the property cycle | residential sales | auctions
we want your
renovated property…
Be a part of the hollis morgan property cycle… Many of our successful auction clients instruct the Hollis Morgan Residential Team to sell their renovated and new build properties. If you instruct our residential sales
team to sell your renovated property, we will refund your buyers’ premium*.
Your property is only new to the market once... get it right first time with Hollis Morgan
turn the page to see some successful examples …
* Based on a 12 week sole agency agreement with a commission rate of 1.5% + VAT.
29 Station Road, Backwell PROFESSIONAL PLANNING APPRAISAL
1. WHAT IS A PPA?
1.1 A PPA is a detailed appraisal of the development potential of a site by qualified
Chartered Planners. It is based on a desk-top review of the site; the relevant
planning policy; and planning history.
1.2 A planning appraisal is one of the most important and often under-rated planning
services provided to clients.
1.3 A well-researched and prepared appraisal will set out in an easy-to-read format,
the relevant opportunities and constraints applicable to a potential development
opportunity.
1.4 This planning appraisal covers all the relevant issues, with the core services as
follows:
i) Identifying planning policies relevant to a site and/or proposal.
ii)
Review of planning history.
iii)
Establishment of existing/lawful uses.
iv) Site assessment to identify planning opportunities and constraints;
v) Comprehensive appraisal covering all planning considerations.
vi)
Provision of development briefs.
vii)
Potential site layouts.
1.5 The PPA report is paid for by the purchaser of the site upon completion (£700 + VAT
is added to the contract) – they then have a £700 credit to spend on planning with
the planning team if they pursue development.
2 | P a g e
29 Station Road, Backwell PROFESSIONAL PLANNING APPRAISAL
2. INTRODUCTION
2.1 This site comprises land which currently forms part of the residential curtilage to no.
29 Station Road.
2.2 The site is located within the defined settlement boundary of Backwell, in North
Somerset Council’s administrative area.
3. OPPORTUNITIES
3.1 The site has several options for development, which include demolition of the
existing bungalow and replacement with a larger two-storey dwelling or a modest
pair of semi-detached houses. Another option, subject to suitable access and
adequate privacy levels for existing and proposed residents being achieved, could
be redevelopment to provide a detached two-storey property at the front of the
site with a small (single-storey) bungalow or annex within the rear garden.
3.2 The site is located within the defined housing development boundary and
consequently the principle of a new dwelling or dwellings in this location accords
with the adopted spatial strategy (Core Strategy 2017 Policies CS14 ‘Distribution of
new housing’ and CS32 ‘Service Villages’; and Policy DM37 of the Development
Management Policies, July 2017).
3.3 The creation of a new dwelling(s) in this location, being within a Service Village, with
good accessibility to public transport, shops, services, education and employment,
would accord with the sustainable development principles of national and local
policy with respect to directing new development to accessible locations, where
there are alternative modes of travel to the private car, and the need to travel is
minimised.
3.4 The site is not in a Conservation Area and there are no Listed Buildings in proximity.
There are no protected trees on or adjacent to the site. The site is within Flood Zone
1 and therefore at low probability of flooding from the sea and rivers.
3 | P a g e
29 Station Road, Backwell PROFESSIONAL PLANNING APPRAISAL
4. CONSTRAINTS
4.1 There is a substation at the front of the site which shares the access to the property
and partially restricts the developable area at the front of the site.
4.2 In order to achieve a pair of semi-detached properties on the site, the existing
property would need to be demolished as well as the existing garages.
4.3 The provision of a dwelling to the rear of the site would also only be likely to be
possible if a new dwelling were constructed at the front of the site (but in line with
the established building line) to allow for sufficient garden space and to ensure
appropriate privacy distances. It is considered likely that, should a dwelling at the
rear be feasible, only a single storey dwelling would be likely to be supported due
to amenity considerations.
4.4 Access to a dwelling in the rear garden would potentially need to be a shared
access and there would need to be sufficient space for cars to turn within the site
and exit on to the highway in a forward gear. A bin storage/collection point may
be required mid-way along the access route should the rear dwelling be more than
30m from the waste collection point (on Station Road).
4.5 The Council applies the National Space Standards for new dwellings, and these
would need to be adhered to (see the Technical Requirements as well as the
GIA/storage requirements in Table 1).
4.6 The site has existing trees and fairly extensive shrub planting, which does not appear
to have been maintained. Thus, there could be potential for wildlife within the site,
and depending on the condition of the bungalow, there could be potential for bat
roosts. The site is within Consultation Zone B for the North Somerset and Mendip Bats
Special Area of Conservation (SAC), and as such, any future planning application
for redevelopment would need to be accompanied by an Extended Phase 1
Survey and a bat survey(s), which would need to be undertaken by a qualified
ecologist. Depending on the results of the Phase 1 survey, other protected species
surveys may be required. Preliminary assessments can take place at any time,
however, protected species and bat activity/emergence surveys can only take
4 | P a g e
29 Station Road, Backwell PROFESSIONAL PLANNING APPRAISAL
place between April and October with May – August being the optimal survey
period. Consultation with an ecologist at an early stage would be advised to
ascertain the works required and any potential mitigation measures that may be
necessary. Planning permission cannot be granted in advance of the survey results.
4.7 The site itself is not at risk of surface water flooding although there is evidence that
the road adjacent to the site may have issues so this will need to be explored. Early
input from a drainage consultant is recommended.
5. DEVELOPMENT POTENTIAL
5.1 The site has the potential to accommodate several different development options,
which are summarised as follows in order of potential planning difficulty:
1. Extend the existing bungalow and add an additional storey
2. Demolish the existing bungalow and build a larger two storey house
3. Demolish the bungalow and erect a pair of semi-detached houses
4. Demolish the bungalow and construct a new dwelling at the front of the
site and a single storey dwelling or annex to the rear.
5.2 The Council operates a Community Infrastructure Levy, therefore any new
residential floorspace will be subject to a charge (see CIL Charging Schedule and
the CIL and Development Contributions SPD, January 2016), payable upon
commencement of the development.
Development Principles and Requirements
5.3 The building line on Station Road and also The Crescent would need to be
respected (i.e. do not project the building beyond it). Overlooking distances will
need to be considered with window to window distances (from first floor level) of
around 21 metres. The Council also requires a 7 metre separation distance between
windows and the gardens of adjacent neighbours (see the adopted Residential
Design Guide SPD parts 1 and 2 for detailed guidance that will need to be
considered in the design of any scheme).
5 | P a g e
29 Station Road, Backwell PROFESSIONAL PLANNING APPRAISAL
5.4 For a pair of semi-detached houses sufficient space will need to be retained either
side of the building to ensure that it does not appear too cramped on the plot. The
side adjacent to the neighbouring bungalow may be particularly sensitive.
5.5 The scale and height of any new build would need to respect the surrounding area.
The site can accommodate two-storey height at the front (i.e. replacing the
bungalow), however a fully hipped roof form may be necessary for the semi-
detached option to off-set the increase in built form and minimise visual impact
within the street-scene. Any development at the rear is likely to be restricted to
single-storey.
5.6 The design of the existing properties in the area is varied and therefore there is
considerable scope for contemporary architecture. The materials used locally are
also varied, although generally properties appear to have a rendered finish with
terracotta roof tiles.
5.7 Parking will need to comply with the adopted parking standards (1 space per 1
bed; 1.5 spaces per 1 bed (2 or more units); 2 spaces per 2 or 3 bed; and 3 spaces
per 4+ bed). Garages can count towards the parking provision but only where they
comply with the size requirements in the adopted Parking Standards SPD.
5.8 Cars would need to be able to turn on the site to leave in forward gear. The Council
would be unlikely to support a scheme where cars need to reverse onto Station
Road due to highway safety considerations and the proximity to Backwell School.
5.9 The provision of parking and turning areas at the front of properties is not
uncommon on this part of Station Road but it is recommended that soft planting is
retained at the site boundaries as well as within the front garden/parking area, to
soften the visual impact. The locations for and types of soft planting should be
indicated on a proposed site plan, however, a condition is likely to be imposed to
secure submission and approval of a detailed scheme, post-decision.
5.10 Consideration could be given to creating a new access onto Station Road should
the location of the existing access in conjunction with the sub station make the
creation of parking difficult.
6 | P a g e
29 Station Road, Backwell PROFESSIONAL PLANNING APPRAISAL
5.11 Secure and fully enclosed cycle storage in a convenient/accessible location will be
required. Garages that comply with the size requirements can be used for cycle
parking.
5.12 The scheme will need to comply with the Nationally Described Space Standard
(Technical Housing Standards); and provide refuse/recycling storage.
5.13 Windows to habitable rooms in the side elevations should be avoided.
Application Report/Survey Requirements
5.14 This is likely to include:
▪ A drainage scheme (Sustainable Urban Drainage);
▪ An Energy Strategy demonstrating that the scheme would deliver 10% of the
predicted energy use through renewable energy sources;
▪ A tree survey, arboricultural implications assessment, method statement, and
tree protection plan;
▪ Ecological Surveys (a Phase 1 survey and potentially protected species
surveys – these would need to be undertaken between May and
September);
▪
Coal Mining Risk Assessment.
6. SKETCH BLOCK PLAN
TO FOLLOW
7 | P a g e
www.hollismorgan.co.uk | [email protected]
TEL | 0117 973 6565 | 9 Waterloo Street, Clifton, Bristol BS8 4BT www.stokesmorgan.co.uk | [email protected] TEL | 01275 390 648 | Kestrel Court, 1 Harbour Road, Portishead BS20 7AN
PPA