Data Loading...

PSS Studies

153 Views
4 Downloads
2.51 MB

Twitter Facebook LinkedIn Copy link

DOWNLOAD PDF

REPORT DMCA

RECOMMEND FLIP-BOOKS

Case Studies

2020

Read online »

Case Studies

38 ILLINOIS Main Facility 218 20th Ave Roseville, IL 61473 Phone: 309.588.4803 SOUTH DAKOTA Drafting

Read online »

Student Accommodation - Case Studies

knight-frank-ucas-student-accommodation-survey- report-2021-7707.pdf Director of Residential Service

Read online »

Case Studies for Multiview

Case Studies for Multiview Case Study The team at Ewing Irrigation is experiencing firsthand the ben

Read online »

Curriculum Studies Guide 2021

The site also offers a Profile Builder function, through which boys can determine how their courses

Read online »

Independent Schools (Midlands) - Case Studies

Estates Contracts and Compliance Manager Due to the recent appointment of a new Estates Director, th

Read online »

Curriculum Studies Guide

Curriculum Studies Guide Curriculum Studies Guide 2022 Introduction Choosing subjects for the follow

Read online »

2022 - EFP Case Studies - Flow Rite

2022 - EFP Case Studies - Flow Rite Epicor Financial Planner | Case Study | Flow-rite Case Study | R

Read online »

2021 - EFP Case Studies - RPB Safety rev2

Success Highlights Challenges • Need to combine two companies into a single financial statement to b

Read online »

2021 - EFP Case Studies - GUNVOR rb

2021 - EFP Case Studies - GUNVOR rb Epicor Financial Planner | Case Study | GUNVOR Case Study | GUNV

Read online »

PSS Studies

Presentation and findings to TNB – SEDA Small Hydro Bidding PSS-1 for ElQuator Energetic Mechanism Sdn Bhd 30 MW Segamat, Johor

19th Sept 2019

List of Revisions

Revision Date

Description of changes

00

12 Sept 2019 Draft issued for Client’s comments and discussion

01

16 Sept 2019 Re-issued for presentation to TNB

02

19 Sept 2019 Re-issued as final with editorial update to slides 5,14,20,21,37 and 39

Revision Date

Names

Author

Technical Review Approved

02

19 Sept 2019 Keehan Chan Afrima Consulting

Keehan Chan

Project introduction

1. Elquator Energetic Mechanism Sdn Bhd 2. 30 MW at Segamat, Johor 3. Small hydro electric power plant (SHEP) 4. Direct to JMTH132

5. Expected COD by December 2024 6. KOM conducted – 03 rd Sept 2019 7. Presentation to SHEP Committee – 17 th Sept 2019

PSS Stage 1 - findings summary

Assessment of: – Impact to the TNB transmission network – Performance requirements of the MGC

 Assessed to have no adverse impact on the TNB network for steady state under CatA, CatB and CatC

 Potential need for reactive power support (depending on plant design)

 Assessed to comply with the performance requirements of the MGC

PSS-1 – Executive summary

Description of SHEP plant

Proposed Land for SHEP plant

Lot 3132, GRN95885, Jementah, Segamat, Johor

Land bank in Segamat, Johor

3 plots estimated to cover 7.5 acres Plot 1 ~ 2.5 acres allocated for the presented SHEP

Plot 3

Plot 2

Plot 1

Lot 3132, Mukim Jementah, Segamat, Johor Darul Takzim Plot 1 - 2°27'56.6"N 102°41'30.1"E / 2.46572, 102.69169 Plot 2 - 2°27'57.9"N 102°41'28.5"E / 2.46607, 102.69126 Plot 3 - 2°27'59.4"N 102°41'26.5"E / 2.46649, 102.69069

Site location photo #1

Site location photo #2

Site location photo #3

Connection of SHEP plant

Direct connection to JMTH132

▪ Potential LSS-3 (100 MWac) direct connection to JMTH132

▪ Existing spare bays reserved for TNB future plan, with SHEP then extension on available space will be necessary

Proposed space for bay extension with UGC termination for SHEP

Bay reserved for TNB future plan

Connection of SHEP plant

Direct connection to JMTH132

Short distance of underground cable (UGC)

Plot 1

132KV PMU Jementah

45 MVA 11KV/132KV 12%

11kV, 4000A, 31.5KA 3 sec

125 Amps

3 MVA 0.400kV/11KV 6%

3,500 Amps

3 rd Block of Generators

2 nd Block of Generators

1 st Block of Generators

G

G

180 units of generator including 30 units back-up on hot standby. For studies only 150 units are considered (except short circuit studies)

12 units @ 295 KVA 236 KW per unit

Rated Power Output= 2,832 kW

SHEP plant electrical information

Preliminary and subject to final design

cct #2

TKAK 132 kV

SGMT 132 kV

cct #1

JMTH 132 kV

LSS-3 100 MWac

Negligible 132 kV UGC

ELQUPCC 132 kV

45 MVA 132/11 kV Main Collector Step-up Transformer Z=12.0%

YNd1

ELQUCOL 11.0 kV

Step-up station (SPP)

Negligible 11 kV connectors

132 kV switching station

45 MVA 11/0.415 kV lumped equivalent representing 15 units of 3.0 MVA collector transformer Z=6%

Dyn11

ELQUGEN 0.415 kV

Lumped equivalent 30 MW Maximum Output at ELQUPCC representing multiple generators

SHEP plant electrical information

▪ SHEP electrical >Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54

www.elquator.com

Made with FlippingBook - professional solution for displaying marketing and sales documents online