Data Loading...
125 Park Tourbook
47 Downloads
2.38 MB
Twitter Facebook LinkedIn Copy link
RECOMMEND FLIP-BOOKS
LOBBY
NEW ELEVATOR CABS
STACKING PLAN
25 — 24 — 23 — 22 — 21 — 20 — 19 — 18 — 17 — 16 — 15 — 14 — 13 — 12 — 11 — 10 —
23rd Floor - 25,171 RSF
Suite 1405 - 1,162 RSF
9 — 8 — 7 — 6 — 5 — 4 — 3 — 2 — 1 —
Suite 302 - 4,174 RSF
Available
RECEPTION ARTIST RENDERING
SUITE 320
Artist Rendering
FLOOR KEY Offices Workstations
36 50
Conference Rooms
6 1 1
Pantry
Reception
Total
87
Click here for more information
PANTRY ARTIST RENDERING
SUITE 320
Artist Rendering
Click here for more information
MAIN AREA ARTIST RENDERING
SUITE 320
Artist Rendering
Click here for more information
EXISTING CONDITIONS
Suite 302 — 4,174 RSF
41st Street
FLOOR KEY Offices Workstations
1
20
Conference Rooms
1 1 1 1
Breakout Room
Pantry
Reception
Total
22
Click here for more information
EXISTING CONDITIONS
Suite 1405 — 1,162 RSF
FLOOR KEY Offices
1 1 1 1 2
Conference Rooms
Pantry
Reception
Total
Click here for more information
OFFICE SPACE ARTIST RENDERING
ENTIRE 23rd FLOOR
Artist Rendering
FLOOR KEY Offices Workstations
36 50
Conference Rooms
6 1 1
Pantry
Reception
Total
87
Click here for more information
CORE AND SHELL
23rd FLOOR — 25,171 RSF
Park Avenue
FLOOR KEY Offices Workstations
36 50
Conference Rooms
6 1 1
Pantry
Reception
Total
87
Click here for more information
PROPOSED OFFICE INTENSIVE
23rd FLOOR — 25,171 RSF
PANTRY
PE
PE
PE
PE
PE
MECH. ROOM
MECH. ROOM
IT
BATHROOM
UP
RISER CLOSET
MEN'S
WOMEN'S
BLDG
SE
RECEPTION
FREIGHT
QTY 8 24 4 50 1 87
Park Avenue
N
1
-- ALL DIMENSIONS AND CONDITIONS ARE -- APPROXIMATE AND SUBJECT TO FIELD VERIFICATION
1/16"=1' SCALE:
16
2 4 8
1
LOFFREDO BROOKS ARCHITECTS P.C. 118 WEST 22ND STREET - 4TH FLOOR NEW YORK CITY, NEW YORK 10011 TEL 212.679.7729 FAX 212.725.8914 E.MAIL [email protected]
PROPOSED PLAN - 23RD FLOOR OFFICE INTENSIVE
SL GREEN REALTY CORP. 125 PARK AVENUE
1
3
DATE: DWG. NO.:
07.21.21
NEW YORK, NEW YORK
4
TF-01
FLOOR KEY Offices Workstations
36 50
Conference Rooms
6 1 1
Pantry
Reception
Total
87
Click here for more information
PROPOSED WORKSTATION INTENSIVE
23rd FLOOR — 25,171 RSF
PE
PE
PE
PE
PE
MECH. ROOM
MECH. ROOM
IT
BATHROOM
UP
TRAINING ROOM
RISER CLOSET
MEN'S
WOMEN'S
BLDG
STOR.
RECEPTION
SE
FREIGHT
CAFE/LOUNGE
PH.
PH.
QTY 18 73 1 92
1
Park Avenue
1
1
N
1
-- ALL DIMENSIONS AND CONDITIONS ARE -- APPROXIMATE AND SUBJECT TO FIELD VERIFICATION
1/16"=1' SCALE:
16
2 4 8
2
LOFFREDO BROOKS ARCHITECTS P.C. 118 WEST 22ND STREET - 4TH FLOOR NEW YORK CITY, NEW YORK 10011 TEL 212.679.7729 FAX 212.725.8914 E.MAIL [email protected]
PROPOSED PLAN - 23RD FLOOR WORKSTATION INTENSIVE
5
SL GREEN REALTY CORP. 125 PARK AVENUE
1
DATE: DWG. NO.:
07.21.21
NEW YORK, NEW YORK
2
TF-01
FLOOR KEY Offices Workstations
18 73
Conference Rooms
6 1 1 1
Training Room
Pantry
Reception
Total
92
Click here for more information
NEIGHBORHOOD MAP
125 Park Avenue
BUILDING FACTS
location
Northeast corner of Park Avenue and 42nd Street
year built
1923 Renovated: 2008
architect
York & Sawyer
building size
653,736 rsf
building height
Twenty-six (26) Floors, basement and sub-basement
building construction
Concrete encased structural steel flange columns Facade: Brick and terra cotta with fenestration and granite with glazed painted aluminum Lobby: Newly renovated with marble walls finished with Italian Basaltina stone flooring Ceilings are vaulted and finished with Venetian plaster
floor sizes
Below Grade
21,809 rsf 15,501 rsf 30,129 rsf 21,929 rsf 31,377 rsf 31,071 rsf 25,723 rsf 25,656 rsf 25,653 rsf 25,366 rsf 26,225 rsf 26,256 rsf 24,809 rsf 25,151 rsf 25,536 rsf 21,123 rsf 9,556 rsf
Ground Floor 2 Floor 3
Floors 4-5 Floors 6-7
Floor 8
Floors 9-14
Floor 15
Floors 16-17 Floors 18-20
Floor 21 Floor 22 Floor 23 Floor 24 Floor 25 Floor 26
floor loads
Basement, Ground, 2nd Floors: 120 lbs/sq.ft. 3rd-26th Floors: 60 lbs/sq.ft .
typical slab heights
11’3”
column spacing
East to West on center is 20’ 6” North to South on center is 21’ 6”
elevators
Fourteen (14) passenger, one (1) freight Loading dock is located on 41st Streets
hvac / supplemental
Two (2) water-cooled DX units per floor, ranging in size from 22 to 35 tons
cooling
Gas boilers provide perimeter heating
electric
Four 4000–amp. 120/208-volt, three (3)-phase, four (4) wire service Up to six (6) watts per sq. ft. available for tenant use
life / safety
Fully addressable Class E system; building fully sprinklered
security / access
The building security desk is manned 24 hours a day, 7 days a week Turnstiles with access cards for tenants in the lobby CCTV surveillance in public areas and all elevators
telecom / cable
Cogent, Lightpath, Spectrum, Cablevision, Verizon and AT&T Wired Certified Gold
transportation
Directly across the street from Grand Central Terminal and Subway Lines - 4, 5, 6, 7, S, B, D, F and V
amenities
Near Pershing Square, restaurant with new outdoor public seating, in building bank and gym
SUSTAINABILITY AT SL GREEN
HIGHLIGHTS
AIR • HVAC systems are equipped with MERV-14 media filters that capture airborne particles, exceeding the requirements of New York City’s Energy Code. • Mechanical systems increase the supply of outdoor air and continuously cycle fresh, filtered air throughout the building. • Base building air quality is assured by WellStat, a monitoring system that provides real-time air quality levels that measure indicators including carbon dioxide, particulate matter, VOCs, temperature, humidity, and more. • Building staff are required to use low VOC emitting products including solvents, carpets, adhesives, paints, and coatings to maintain optimal indoor air quality. BUILDING HEALTH & SAFETY • 125 Park Ave. is WELL Health-Safety Rated, under an evidence-based, third-party verification of the effectiveness of our operational and maintenance protocols. • Janitorial staff conduct high frequency cleaning and sanitization using green cleaning products. • Construction materials used at 125 Park Ave. are LEED-compliant, recycled, responsibly sourced, and non-toxic. • SL Green provides training on emergency preparedness and workplace safety to building occupants and coordinates response drills quarterly. ENERGY • 125 Park Ave. is equipped with automated control systems. • LED lighting systems are installed throughout building common areas to increase energy efficiency. • SL Green’s Engineering team uses a real-time energy management platform (iES EnergyDesk) to monitor energy use in 15-minute intervals and respond to building conditions promptly. • SL Green invests in capital upgrades and commissions building systems to ensure they are maximining performance. RECYCLING • 125 Park Ave. deploys a color-coordinated recycling procedure to minimize waste sent to landfills. • We conduct annual waste audits to identify areas for waste diversion improvement and develop corrective action plans. • We offer free recycling training sessions to tenants. • Janitorial staff uses double-barrel waste bins to ensure waste streams remain separated and are trained annually to maintain recycling best practices. • We offer complimentary e-waste pick-up to tenants to ensure materials are properly recycled. WATER • Existing toilets, urinals, faucets, and showers have been upgraded with low-flow fixtures, performing 20% above code requirements for water conservation. • Building engineers review water logs daily to compare trends and identify potential water loss. • SL Green disinfects cooling towers twice a year and conducts testing for legionella bacteria every 90 days.
SUSTAINABILITY AT SL GREEN
BUILDING ACHIEVEMENTS
TENANT PARTNERSHIPS
We support tenant sustainability reporting through >Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20
Made with FlippingBook - Online magazine maker