The meeting with Energy Commission’s officer from Renewable Energy section on Tuesday, 22 nd October 2019 clearing the facts that: • Energy Commission will propose for wind quota to be included in Feed-in-Tariff (FiT) and later be gazette under SEDA for bidding. • A proof of concept on the availability of power of wind energy in Malaysia must be made known to Energy Commission for the wind quota to be open for bidding. • Energy Commission is anticipated about ElQuator's wind technologies as it is not like the traditional wind turbine. • The chances for ElQuator Malaysia to dominate this segment is HUGE since there is no other player in Malaysia have technology that can produce wind energy.
ENERGY COMMISSION ALLOWANCE
According to Energy Commission, any system installed that produces electricity below 72kWh is allowed without a license. It is for self-consumption. The same applies to a country like India and the Philippines. With the allocation for that, it is easy to put ElQuator’s system anywhere that requires cheaper electricity tariff and a power supply.With the attractive price per kilo-watt hours offered, it will be a rosy journey for everybody.
BELOW 72kW SCHEME
ElQuator has planned an attractive business module that will benefit all, the investors, our distributors, and the end-users. (Please find the booklet in the folder)
PLANNING &TARGET
Starting now until 1 st April 2020, target of 25 units wind energy system will be established on top of high-rises building around Kuala Lumpur. The first installed is on top of 30 storeys MKH Boulevard in Kajang.
This is to create a case study and proof of concept in a way to push through and presented to EC for establishment of wind quota under FiT exercise.
The next in line for the installation will be:
Damai 88 @ Kuala Lumpur – 21 storeys
Serin Residency @ Cyberjaya – 30 storeys
Mutiara Oriental @ Petaling Jaya, Selangor – 18 storeys
MKH Boulevard II @ Kajang - 42 storeys
MKH World @ Kajang - TBA MKH Hillpark Residence @ Semenyih – 24 storeys
ElQuator has set the target to have 500 installations under 72kWh system for the next 36 months starting January 2020 on high rise buildings nationwide.
To push through to EC for a wind energy quota, ElQuator will establish a case study according to all high-rise installations.This will show that with the latest technologies, energy can be generated by wind.
To add to the establishment a proof of concept for EC,WindValley by ElQuator will also be the showcase project.
PROOF OF CONCEPT
With that, there will be no reason for EC not to take into consideration to start quota for wind energy to be included into SEDA Renewable Energy program.
EC is aware on the chances of other energy system besides solar but up until now to have any establishment from the proof-of-concept
THE ENERGYVALLEY BY ELQUATOR
Equipped with the approved Power System Studies by TNB and next- door power transfer to TNB’s power main injection, it is very easy to establish the connection.
With 7.5 acres of land in Johor, the valley will have stand-alone micro- hydro and vertical windmills installed to produce electricity.
Energy Commission then will get to see living proof of concept on the stand-alone micro-hydro and vertical windmill system on how easy and workable it can be.
Malaysia will somehow open to the technologies and it will be a fruitful way in the year ahead.
THE ENERGYVALLEY IN JOHOR
Plot 1
THE ENERGYVALLEY IN JOHOR
TNB’SAPPROVAL LETTER FOR 90MW INJECTIONTO THE PMU JEMENTAH, JOHOR
VenturingASIA
Presented by:
MALAYSIA
Notthingham University – 500kWh stand-alone micro- hydro
Damai88 Service Apartments – below 72kWh wind energy systems
MKH Boulevard – 100kWh wind energy systems
Tiarasa Escapes – 100kWh stand-alone micro-hydro
Sepang International Circuit (SIC) – 2.7MWh
Movie Animation Park Studios with Maju Perak Energy Resources Sdn Bhd - 1MWh
Sultan Abdul Aziz Shah Golf & Country Club – 330kWh stand-alone micro-hydro
Explicit Aqua Innovations Sdn Bhd – 1MWh stand-alone micro-hydro
MAINS Holding Sdn Bhd – 800kWh stand- alone micro-hydro
Hajj Fund - TBC
MelakaWonderland Theme Park & Resort with Melaka Wonderland Sdn Bhd – 230kWh
Universiti Sultan Zainal Abidin – 2.8MWh stand-alone micro- hydro
A’Famosa Resort Hotel with A’Famosa Resort Hotel Sdn Bhd - TBC
PHILIPPINES
Mactan Rock Industries Incorporated (200 MW) - They need 200MW of power to produce 20,000 Cubic Meters per day of water to supply the entire island of Mactan. In order to be competitive, the price of power must be 6.00 Php per kilo-watt hours. They need this by the first quarter of 2020.
Papakits Lagoon and Marine Sanctuary (1 MW) - Resort located in Liloan Cebu. It is an adventure park and is getting its power from the local utility, VECO, at 10.50 Php per kilo- watt hours. This price includes distribution and transmission service fees.
Stakili Garden and Beach Resort. (500 KW) - Its a resort in Compostela town, north of Cebu City. They are getting their power from local utility, VECO, at 10.50 per kilo-watt hours .This price includes distribution and transmission service fees.
Nalusuan Island Resort and Marine Sanctuary (3MW) - This is an island resort located in Cordova, Mactan Island. They are being powered now with a diesel feed generator sets 24/7. ElQuator technology is best for them.
Mactan Cebu International Airport (20MW) - International Airport of Cebu, its one of the most modern airport of the Philippines. They're getting power from local utility, MECO, at 12.00 Php per kilo-watt hours including Distribution and Transmission charges. Power Stability is also a problem that they need to run generator sets in time of fluctuation which is frequent due to lack of power supply in the island.
Parklane Bohol Resort and Spa (1MW) - A resort hotel in Anda Bohol. They are getting from the electric cooperative, BOHECO, at 13 Php per kilo-watt hours including distribution and transmission charges. The problem is the stability of power, sometimes its high voltage and sometimes low, making their equipment vulnerable to failure.
Park Lane Internatonal Hotel (1 MW) - A Business Hotel located in Cebu City Business District. They are getting their power from local utility, VECO, at 10.50 per kilo-watt hours. This price includes distribution and transmission service fees.
Waterfront Hotels (3 MW)
The meeting has been confirmed and will be held on 16th and 17th December 2019 with the respective Government link companies in Cebu Island to discuss on to move ahead. Mr. Henrik Pryter and Mr.Victor Vitto will represent ElQuator to the meeting.
INDIA
Meghalaya States of India – 250MW pilot project. Will then extend offer up to 2000MW
Assam Power Corporation - 250 MW on PPA in name of ElQuator
Assam Petrochemical - 1 MW (sales of Systems on BOT )
Government Of Meghalaya - TBC
Gujarat - Government bodies for sustainable development of rural, island, isolated areas for electrify that area - TBC
Assam Home / Power Ministries - 250 MW on PPA in name of ElQuator
Autonomous Councils - 60MW (sales of Systems on BOT)
Gujarat Electricity Development Agency) – TBC
INDIAN e-VISA Electronic Travel Authorization (ETA)
INDIAN e-VISA Electronic Travel Authorization (ETA)
Dear PRYTER HENRIK Your application for Indian e-Visa has been processed with following result. Application Id : I004W0B6ED19 Passport Number : 209494912 Application Status : GRANTED ETA Number : 9024D857J Nationality : DENMARK Visa Type : e-Visa Service name : eBUSINESS VISA No. of Entries : Multiple
Dear VITTO VICTOR NOPIA Your application for Indian e-Visa has been processed with following result. Application Id : I004W0B65C19 Passport Number : EC5576949 Application Status : GRANTED ETA Number : 90250710J Nationality : PHILIPPINES Visa Type : e-Visa Service name : eBUSINESS VISA No. of Entries : Multiple
I004W0B6ED19
I004W0B65C19
Date of issue of ETA :- 13/NOV/2019 Date of expiry of ETA :- 11/NOV/2020 e-Visa Validity period is 365 days from the date of issuance of this ETA. > Activities Permitted : • Expert/specialist in connection with an ongoing project > Continuous stay during each visit should not exceed 180 days. > If the intention is to stay for more than 180 days, then you should register with concerned FRRO/FRO within two weeks after the expiry of 180 days of your arrival in India. > You should also be required to register with the FRRO/FRO concerned in case the aggregate stay in India exceeds 180 days. > Multiple entries will be granted within e-Visa validity period stamped on your passport. For Tele Enquiries (IVRS enquiry) call at +91-11-24300666.Please use 0044682919 as key. Note : - Please carry a copy of this ETA at the time of your arrival in India. - e-Visa is non-extendable, non-convertible & not valid for visiting Protected/Restricted and Cantonment Areas.If you intend to visit Protected/Restricted/Cantonment areas, you would require prior permission from the Civil Authority.Please visit (http://www.mdoner.gov.in/content/rappap-restrictedprotected-area-permit) for more information. - Biometric details of the applicant will be mandatorily captured at Immigration on arrival in India. - Applicant must arrive with the same passport as mentioned above. However, entry may be allowed on the new passport even if ETA has been issued on the old passport, but in that case the traveler must carry the old passport on which ETA was issued. - Please check all the details including Nationality, Name, Passport number, Date of Birth etc. mentioned on the ETA. If there is any discrepancy, please contact e-Visa support centre at [email protected] for assistance. - Applicant can arrive at 28 e-Visa designated airports i.e. Ahmedabad , Amritsar , Bagdogra , Bengaluru , Bhubaneshwar , Calicut , Chandigarh , Chennai , Cochin , Coimbatore , Delhi , Gaya , Goa , Guwahati , Hyderabad , Jaipur , Kolkata , Lucknow , Madurai , Mangalore , Mumbai , Nagpur , Portblair , Pune , Tiruchirapalli , Trivandrum , Varanasi , Vishakhapatnam and 5 designated seaports (i.e. Chennai , Cochin , Goa , Mangalore , Mumbai ). However, he/she can depart from any of the authorized Immigration Check Posts in India. - e-Visa is not allowed for employment, NGO activities and journalism purposes - Once you have entered India, you will be subject to Indian Laws. - This electronic travel authorization does not entitle you for guaranteed entry into India. Your entry can still be refused at the time of arrival. - Please confirm that your ETA status is shown as GRANTED on our Official website (https://indianvisaonline.gov.in/visa/tvoa.html) prior to commencement of your journey. - Applicant must carry YELLOW FEVER VACCINATION CARD if arriving from yellow fever affected countries. Please visit the link given below (http://www.mohfw.nic.in/index1.php?lang=1&level=1&sublinkid=1342&lid=1259) - For any assistance contact e-Visa support center at [email protected]
Date of issue of ETA :- 14/NOV/2019 Date of expiry of ETA :- 12/NOV/2020 e-Visa Validity period is 365 days from the date of issuance of this ETA. > Activities Permitted : • Expert/specialist in connection with an ongoing project > Continuous stay during each visit should not exceed 180 days. > If the intention is to stay for more than 180 days, then you should register with concerned FRRO/FRO within two weeks after the expiry of 180 days of your arrival in India. > You should also be required to register with the FRRO/FRO concerned in case the aggregate stay in India exceeds 180 days. > Multiple entries will be granted within e-Visa validity period stamped on your passport. For Tele Enquiries (IVRS enquiry) call at +91-11-24300666.Please use 0044668419 as key. Note : - Please carry a copy of this ETA at the time of your arrival in India. - e-Visa is non-extendable, non-convertible & not valid for visiting Protected/Restricted and Cantonment Areas.If you intend to visit Protected/Restricted/Cantonment areas, you would require prior permission from the Civil Authority.Please visit (http://www.mdoner.gov.in/content/rappap-restrictedprotected-area-permit) for more information. - Biometric details of the applicant will be mandatorily captured at Immigration on arrival in India. - Applicant must arrive with the same passport as mentioned above. However, entry may be allowed on the new passport even if ETA has been issued on the old passport, but in that case the traveler must carry the old passport on which ETA was issued. - Please check all the details including Nationality, Name, Passport number, Date of Birth etc. mentioned on the ETA. If there is any discrepancy, please contact e-Visa support centre at [email protected] for assistance. - Applicant can arrive at 28 e-Visa designated airports i.e. Ahmedabad , Amritsar , Bagdogra , Bengaluru , Bhubaneshwar , Calicut , Chandigarh , Chennai , Cochin , Coimbatore , Delhi , Gaya , Goa , Guwahati , Hyderabad , Jaipur , Kolkata , Lucknow , Madurai , Mangalore , Mumbai , Nagpur , Portblair , Pune , Tiruchirapalli , Trivandrum , Varanasi , Vishakhapatnam and 5 designated seaports (i.e. Chennai , Cochin , Goa , Mangalore , Mumbai ). However, he/she can depart from any of the authorized Immigration Check Posts in India. - e-Visa is not allowed for employment, NGO activities and journalism purposes - Once you have entered India, you will be subject to Indian Laws. - This electronic travel authorization does not entitle you for guaranteed entry into India. Your entry can still be refused at the time of arrival. - Please confirm that your ETA status is shown as GRANTED on our Official website (https://indianvisaonline.gov.in/visa/tvoa.html) prior to commencement of your journey. - Applicant must carry YELLOW FEVER VACCINATION CARD if arriving from yellow fever affected countries. Please visit the link given below (http://www.mohfw.nic.in/index1.php?lang=1&level=1&sublinkid=1342&lid=1259) - For any assistance contact e-Visa support center at [email protected]
VIETNAM Vietnam’s Government is very keen to form an alliance with ElQuator for capturing the Renewable Energy market demand with a Joint-Venture setup.Their plan is to cater and provide electricity to the whole nation.This is agreed byVietnam's EnergyVice-Minister. A complete proposal will be drafted to proceed with the arrangement and planning.
The possible meeting will be arranged withVietnam's EnergyVice-Minister soonest possible to further discuss on the Joint-Venture arrangement.
Vietnamese Government has set the target for Renewable Energy electricity production is 10 per cent by 2030. To meet the growing demand, Vietnam needs 60,000MW of electricity by 2020, 96,500MW by 2025, and 129,500MW by 2030.To do so, the country needs to increase its installed capacity by 6,000MW – 7,000MW annually and spend close to US$148 billion by 2030.
With electricity demand projected to increase by eight percent annually until 2025; the government is moving forward to develop renewable energy sources to ensure energy security and addressing the growing power demand. Small hydro makes up most of the current renewable investment inVietnam with 37.6% and total of 15,857MW.
VIETNAM
With planning for Vietnam will come through, it is best to understand that the initiative is done by ElQuator’s team's effort.
Therefore, Mr. Gérard Lori will not be part of the arrangement as from now on,Vietnam’s Government will work closely, hand in hand with ElQuator’s team.
Mr. Gérard Lori did not further initiate the interest from Vietnam and with that, Mr. Henrik Pryter will not hand over any commission to him. He cannot claim anything as this is not his work.