Data Loading...

CCAC Bid 1101 - Addendum No. 1

357 Views
194 Downloads
2.75 MB

Twitter Facebook LinkedIn Copy link

DOWNLOAD PDF

REPORT DMCA

RECOMMEND FLIP-BOOKS

Bid Proposal No. 1101 - Addendum No. 2

2020 CCAC Location Overview Photo Log 3 1000 McKee Rd Oakdale, PA 15071

Read online »

Bid 1095 - Addendum No. 1

4" per ft. slope - Includes a 4.0" (2.0" + 2.0") base layer with 0.5" taper start to meet 4.5" minim

Read online »

Bid Proposal 1102 - Addendum No. 1

LF Contractors may bid on Base Bid #1 only or Base Bid #2 only or both. CCAC shall have the right

Read online »

Bid 1101

21 Project Labor Agreement February 15, 2011 COMMUNITY COLLEGE OF ALLEGHENY COUNTY 800 ALLEGHENY AVE

Read online »

CCAC Bid 1096 - Invitation to Bid

Approval. a) Prior to the commencement of any work or services under this Contract, Professional sha

Read online »

CCAC Bid 1098 - Invitation to Bid

purchase-terms-and-conditions.pdf PAGE 9

Read online »

CCAC Bid 1100 - Invitation to Bid

purchase-terms-and-conditions.pdf + CISCO SYSTEMS, INC. LETTER OF AUTHORIZATION (LOA) - CUSTOMER CON

Read online »

CCAC Bid 1099 - Invitation to Bid

purchase-terms-and-conditions.pdf

Read online »

RFP 3130 - Addendum 1

Headcount numbers for next year are as follows. Of these, we are projecting to have 60-70% in person

Read online »

CCAC Bid 1095 - Replace Roof at Library Building - Alleghen…

21 Project Labor Agreement February 15, 2011 COMMUNITY COLLEGE OF ALLEGHENY COUNTY 800 ALLEGHENY AVE

Read online »

CCAC Bid 1101 - Addendum No. 1

COMMUNITY COLLEGE OF ALLEGHENY COUNTY PURCHASING DEPARTMENT 800 ALLEGHENY AVENUE, PITTSBURGH, PA 15233

ADDENDUM NO. 1 BID PROPOSAL NO. 1101 REPLACEMENT OF MAIN ROOF – WEST HILLS CENTER JUNE 24, 2022

The following additional information is hereby made a part of this bid proposal: *****************************************************************************

Please note that the due date has been extended one week to Wednesday, July 13, 2022 at 2:00 p.m.

General

1.1

The lightning projection on the main roof will have to be recertified.

1.2

Plumbing:

A. All drains will be replaced with new cast iron drain assemblies.

B. Three new drains will be installed. It was conveyed during the prebid that the ceiling is not a plenum ceiling. Therefore, PVC piping will be used. The drains installed (new and existing locations) will be insulated with plastic bowl covers. The piping and only the new piping will be insulated. CCAC will contact EIS Solar to remove the solar panels prior to roof installation and reinstallation when the roof is complete. CCAC will cover those costs. The roofing contractor will provide precut slip sheets of TPA material to be provided to the solar company.

1.3

1.4 The roofing contractor will be responsible for wood required to raise any units, skylights, etc. to acceptable flashing heights. The roofing contractor will not be required for any finishing drywall within the skylights or disconnects for any units. This work, if needed, will be the responsibility of CCAC. 1.5 CCAC is currently evaluating all the units/items that are listed as obsolete (e.g. the firehoses) or abandoned in place. See attached drawing. More information will be reported on this in a future addendum. 1.6 CCAC would like the roofing contractor to remove the one obsolete HVAC unit from the roof. CCAC will evacuate the unit and disconnect any electric and plumbing. CCAC would like the roofing contractor to supply a metal, double broke, cap over the unit curb and the portal curb. 1.7 The six (6) canopies that cover doors will be replaced. New wood blocking will be installed. New 1.5 inches of isocyanurate will be adhered to the metal deck with low rise foam insulation adhesive. Tapered edge strips will be installed to kick water away from the back wall. Install the new TPA membrane with a drip edge made from TPA metal.

1.8 The two newer canopies that were installed in 2006 when CCAC purchased the building has fully adhered EPDM roofs. These roof systems will be restored with Alphaguard MTS.

Continued

ADDENDUM NO. 1 BID PROPOSAL NO. 1101 REPLACEMENT OF MAIN ROOF – WEST HILLS CENTER JUNE 24, 2022

1.9 The wastewater treatment facility will be included in this project. More information will be supplied in a future addendum.

1.10 The two ladders on the roof will be removed by the roofing contractor. Therefore, no permanent safety will be required in those areas. The roofing contractor will touch up/repair the metal extender in these areas.

1.11 The perimeter coping metal will be metal shall be 0.050” aluminum, Kynar standard colors. The existing metal extender will remain.

1.12

The insulation package to be installed over the existing two inch insulation will be

A.

Minimum thickness: ½”

B.

1/8 inch tapered

End of Addendum 1.