Data Loading...

MKH Boulevard wind system

302 Views
98 Downloads
20.53 MB

Twitter Facebook LinkedIn Copy link

DOWNLOAD PDF

REPORT DMCA

RECOMMEND FLIP-BOOKS

MKH Boulevard v.02

Stakeholders) • Industry: Focus on specific market and contract requirements, guaranteeing performan

Read online »

Damai88 wind system

200 kW system model approximately 4m2 x 4m2 with 8m height MONITORING SYSTEM Our systems can be moni

Read online »

BGB: Wind Brochure

BGB: Wind Brochure W ind S olutions We are a: B uilder of Partnerships G enerator of Solutions B rig

Read online »

Nilkamal Shuttle Racking System

Semi-automated system minimizes manual intervention & labour. Its safe design absolutely ensures saf

Read online »

Mondo UNITE Turf System

D O U B L E B A C K I N G , T R I P L E I MP R O

Read online »

ElQuator system

8B, Palm Industrial Park Bandar Teknologi Kajang 43500 Semenyih, Selangor Tel: +6(03)8726 0207 Email

Read online »

Wind Power for Oman

Wind Power for Oman POWERING OMAN WITH WIND ENERGY The Neglected Energy Source WIND >Page 1 Page 2 P

Read online »

Opportunity in Wind Energy

Opportunity in Wind Energy MOVING FORWARD WITH RENEWABLE ENERGY BUSINESS PROPOSAL FOR 72kWALLOCATION

Read online »

ElQuator system

8B, Palm Industrial Park Bandar Teknologi Kajang 43500 Semenyih, Selangor Tel: +6(03)8726 0207 Email

Read online »

Nilkamal Cold Storage System

Temp based). TECHNICAL DETAILS 60, 80, 100, 125 & 150 mm 1 2 Thickness GI Pre-Painted Sheet, GI Plai

Read online »

MKH Boulevard wind system

ANYBODY CANAGREE TO ENJOY CHEAPER TARIFF – WITH NOCOST It is not that difficult to set up a system that can produce clean energy. However the scale of it can be a huge challenge. The difficult part is to make it stable and to make it profitable. Reducing cost is a no-regrets move in an industry facing slow growth, rising cost and heightened competition. ElQuator offers a progressive solution that is easily integrated into existing architecture. It simplifies the procurement process for energy storage with full planning and deployment and fully managed construction in sustainable ways as follows: ü Security: Delivering the highest level of reliability and availability of electricity to end– users in all areas/part of the world (all system run on a storage concepts, nonstop – get the power you need when you need it) ü Environment: CO2 free, clean energy from existing resources. NO need for nuclear power or construction of new Hydro dams ü Economy: Cost effective energy. Under this model, there is essentially NO cost to the Government/Grid System Operators and Regulators (installation costs will be borne by the Group Founders/Stakeholders) ü Industry: Focus on specific market and contract requirements, guaranteeing performance on unique market and operating constraints as well as improving domestic infrastructures

FOCUS ON MONEY IN A TWO-WAY STREET

‡ To generate & supply sustainable electricity (SEP)* ‡ To treat & supply cleanwater consumption (UWS)* ‡ To set up a waste managementsystem ‡ To develop&manage the projectfrom initial feasibility studies, projectbudgeting, masterplanning, fund sourcing, construction& ultimatelyopening& operation ‡ To providemaintenance & services ‡ To ensure 98% manpowerwill be recruited locally ‡ To allocate 8% of our gross income to CSR: ‡ education/scholarship ‡ green infrastructures/initiatives * SEP – Sustainable Energy Plant UWS – UndergroundWaterSystem

‡ To identifyasuitable location fordevelopment ‡ To provide 30 acres of land (lease orsell) ‡ To provide IPP licensed capacity/permits ‡ To pay electricity consumed basedon agreed prices/rates set by TNB/Energy Regulator ‡ To establish a long termcontract on energy supply, land acquisition&necessary licenses ‡ To provide access to local universities/schools/local institutions fortechnology transfer ‡ To identify&source local talent supply ‡ To establish aframe work formonitoring utilization of trust fund& CSR initiatives

29

PROPOSAL FOR MKH BOULEVARD’s BASEMENT PARKING

This proposal is drafted to provide alternative power for MKH Berhad. The installation of our system will power up the basement parking facility in MKH Boulevard with green and clean energy as promoted by the Government. It is also the aspiration that been voiced out by our MESTECC’s Minister in opting to Renewable Energy for not only to save the Ringgit and cents but to reduce carbon emissions. Our proposal to MKH Berhad: • ElQuator will install and maintain a 35kWh Wind Energy System (Vertical Windmill) complete with Storage System on the location as per the next pages (on top of the building) to harness the wind energy • ElQuator will charge RM0.28 per kilowatt-hour for the power consumed including the service and maintenance charges • MKH Berhad will sign a contract agreement for 21 years (or with any ElQuator’s subsidiaries that will sign the agreement with MKH Berhad) • ElQuator will increase the tariff by 1.2% every year for 21 years

• MKH Berhad will enjoy one (1) month free trial period • ElQuator will install the complete system by March 2020

ZERO INVESTMENT • It is a zero investment for MKH Berhad. ElQuator will install the system including all the setup such as transfer cables, metering, etc • MKH Berhad will enjoy cheaper electricity tariff without to finance anything • MKH Berhad only pay the power utilized every month as per the metering installed • ElQuator will send an invoice for the usage of kilowatt-hours rated at RM0.28 every month • MKH Berhad will make payment to ElQuator (or any ElQuator’s subsidiaries that will sign the agreement with MKH Berhad)

PROPOSED INSTALLATION • ElQuator will install three (3) units of 35kWh Windmill System complete with Storage System on the peak of the MKH Boulevard building (as per visual on the next page) • The power generates then transferred to the dedicated MSB and distribute to power up the basement parking • ElQuator will supply power to Buena Vida Restaurant. This charges will not reflect in MKH Berhad’s monthly bill

PROPOSED INSTALLATION

Artist illustration of the system

VERTICALWINDMILL VIEW

VERTICALWINDMILL

The idea behind our Vertical Windmill System is, we come up with a very light windmill with the same m2 wing area as a traditional windmill. We use natural elements to spin our shafts to drive our generators. We fill up our storage by the moving shafts. For each windmill there is a special designed storage system. If there is no wind, the power from storage drives the shafts and energy will be produced Unlike the traditional windmill that use high knot wind to move the blades that rotate the shafts, our Vertical Windmill System is more useable in any areas and runs well regardless of any wind direction. It is suitable to be placed on tall building and as such, we design the tower to be high not only to stores the whole system in it but also to place the windmill on top of it Together with the system, you could find our Vertical Windmill System operational components comprises of generator, smart energy system, motor and controller box. All this component is the ‘heart’ that makes the Vertical Windmill System alive The base of Vertical Windmill System are two gear box with ratio 1:5, control box build on Raspberry P I-3 and ESP 32, one wind turbine generator and one energy system generator It hold Smart Energy System made from LithiUm Ion Polymer 18650 Batteries controlled by ESP 32 and Interface board, both are our own design. The output come from pure sine wave inverter with makes load at the design rate

VERTICALWINDMILL SYSTEM

• Wind system that run 24/7 with constant power output • Even during low and zero wind • Able to produce 300watt, 900watt, 3kW, 5kW, 10kW, 25kW, 50kW, 100kW , 200kW • Can operate both on and off grid • For 25kW and above, can be in single unit or three phase power equals to 50/60 Hz 440 V • Three phase system available for 100kW and 200kW • Foot print for 100/200 kW system model approximately 4m2 x 4m2 with 8m height

MONITORING SYSTEM

Our systems can be monitored either from the control room or on any smartphone. We can monitor the system's performance anywhere in the world to ensure it is running perfectly and able to deliver the desired electricity needed for our client. Our monitoring system will show all the >Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22

www.elquator.com

Made with FlippingBook - professional solution for displaying marketing and sales documents online