Data Loading...
220 East 42nd Tourbook
19 Downloads
16.89 MB
Twitter Facebook LinkedIn Copy link
RECOMMEND FLIP-BOOKS
10 East 53rd Tourbook
cable Altice, AT&T, Cogent, Crown Castle Fiber, Extenet Sytems, Pilot FIber, and Spectrum Business W
220 Hawthorne Way, Delran
month Association Includes: Common Area Maintenance, Exterior Building Maintenance, Lawn Maintenance
Melaleuca: Ein Überblick - Deutsch
>Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page
220 Fishponds Road - PPA
2022 09:37 Page 6 TEL | 0117 973 6565 | 9 Waterloo Street, Clifton, Bristol BS8 4BT www.hollismorgan
555 West 57th Tourbook
16A media filters that capture airborne particles, exceeding the requirements of New York City’s Ene
625 Madison Tourbook
7 Extensive CCTV coverage Building messenger center Tenant visitor portal to pre-register guests for
304 Park Tourbook
aluminum, and electronic waste. > Water conservation measures since 2011 have contributed toward sa
280 Park Tourbook
CABLE CONSTRUCTION • Lobby spanning Park Avenue block front with 25’ ceiling height • Plaza with abu
100 Church Tourbook
7-day attended lobby, turnstile access, CCTV and messenger center Addressable Class E System Life Sa
420 Lexington Tourbook
CABLE Altice, AT&T, CenturyLink, Congent, Crown Castle Fiber, Spectrum Business,Towerstream Wired Ce
ARCHITECTURALLY DISTINCT. HISTORICALLY SIGNIFICANT.
OPPORTUNITY HIGHLIGHTS
• Steps to Grand Central and top restaurants • Landmarked lobby
• 8,900 - 14,000 RSF tower floors • 2,900 - 14,000 RSF high-end pre-builts • 100,000 RSF block opportunity • Robust infrastructure
• Stunning river and city views • Exceptional outdoor space
S T A C K P L A N
37
36
35
34
33
32
31
6,465 RSF
30
29
13,222 RSF
28
TOTAL BLOCK 40,837 RSF
13,222 RSF 14,393 RSF
27
26
25
24
14,295 RSF
23
22
14,318 RSF
21
20
19
18
17
16
15
14
13,716 RSF
13
12
11
10
9
8
7
6
5
3,082
RSF
4
3
2
1
EXISTING CONDITIONS SUITE 408 3,082 RSF
FLOOR KEY: Offices Workstations
5 7 1 1 1
Conference/Meeting Room
Reception
Pantry
Total Headcount
13
N
PROPOSED LAYOUT SUITE 409A 1,873 RSF
FLOOR KEY: Offices Workstations
2 6 1 1 1 9
Conference/Meeting Room
Reception
Pantry
Total Headcount
PROPOSED PLAN SUITE 409-10 22,691 RSF
SPACE SUMMARY SPACE TYPE
QTY
4P CONF. RM
BREAKOUT
EXEC. OFFICE
5
WINDOW OFFICE
11
INTERIOR OFFICE
13
WORKSTATION - 6' X 6'
81
25
RECEPTION
1
G
TOTAL HEADCOUNT
111
16P CONFERENCE ROOM
1
FLOOR KEY: Executive Offices Windowed Offices
6P CONFERENCE ROOM
1
4P CONFERENCE ROOM
2
5
PHONE ROOM
6
PHONE
PHONE
PHONE
BREAKOUT
1
11 13 81
KEY PLAN
Interior Offices 41ST STREET
Workstations - 6’ x 6’
Reception
1
Total Headcount
111
PHONE
PHONE
PHONE
16P CONF. RM
MAIL/COPY
42ND STREET
16P Conference Room 6P Conference Room 4P Conference Rooms
1 1 2 6 1
COATS
4P CONF. RM
STORAGE
BLDGMECH
RECEPTION
CAFE
SERVER ROOM
Phone Rooms
C
ELEC
B
Breakout
JAN
MENS
22
23
15
16
17
18
20
21
24
19
-- ALL DIMENSIONS AND CONDITIONS ARE -- APPROXIMATE AND SUBJECT TO FIELD VERIFICATION
NTS SCALE:
LOFFREDO BROOKS ARCHITECTS P.C. 118 WEST 22ND STREET - 4TH FLOOR NEW YORK CITY, NEW YORK 10011 TEL 212.679.7729 FAX 212.725.8914 E.MAIL [email protected]
PROPOSED PLAN PARTIAL 4TH FLOOR
SL GREEN REALTY CORP. 220 EAST 42ND STREET
DATE: DWG. NO.:
08.09.21
NEW YORK, NEW YORK
TF-01
42ND STREET
EXISTING CONDITIONS SUITE 710 5,840 RSF
FLOOR KEY: Offices Workstations
9
12
Conference/Meeting Room
1 1 1
Reception
Pantry
Total Headcount
22
FLOOR KEY: Ofces
9
Conference Rooms
1
Workstations
12
Reception
1
Pantry
1
Storage
1
EXISTING CONDITIONS SUITE 1306 13,716 RSF
FLOOR KEY: Offices Workstations
17 76
Conference Rooms
3 1 1
Pantry
Reception
Total Headcount
96
PROPOSED LAYOUT OFFICE INTENSIVE ENTIRE 21ST FLOOR 14,318 RSF
8P CONF. RM
FLOOR KEY: Executive Offices
5
Offices
19 23
4P CONF. RM
STOR.
PHONE
COATS
Workstations - 6’ x 6’
Reception
1
ELEC. CL.
MOTHERS' ROOM
Total Headcount
48
RECEPTION
MAIL/COPY
12P CONF. RM
12P Conference Room 8P Conference Room 4P Conference Room
1 1 1 1
DF
CAFE
MEN'S
Phone Room
WOMEN'S
J. CL.
ADA W.C.
STORAGE
IT ROOM
42ND STREET
-- ALL DIMENSIONS AND CONDITIONS ARE -- APPROXIMATE AND SUBJECT TO FIELD VERIFICATION
NTS SCALE:
LOFFREDO BROOKS ARCHITECTS P.C. 118 WEST 22ND STREET - 4TH FLOOR NEW YORK CITY, NEW YORK 10011 TEL 212.679.7729 FAX 212.725.8914
PROPOSED PLAN - 20TH FLOOR OFFICE INTENSIVE
SL GREEN REALTY CORP. 220 EAST 42ND STREET
SPACE SUMMARY
PROPOSED LAYOUT OPEN PLAN ENTIRE 21ST FLOOR 14,318 RSF
QTY 3 8 61 1 73
1
1
2
3
1
8P CONF. RM
FLOOR KEY: Executive Offices
3 8
Offices
4P CONF. RM
STORAGE STORAGE
Workstations - 6’ x 6’
61
COATS
PHONE
Reception
1
PHONE
ELEC. CL.
Total Headcount
73
MAIL/COPY
RECEPTION
12P CONF. RM
12P Conference Room 8P Conference Room 4P Conference Room
1 1 2 1 3
MEN'S
Breakout
BREAKOUT
Phone Rooms
CAFE
WOMEN'S
J. CL.
ADA W.C.
IT ROOM
MOTHERS' ROOM
4P CONF. RM
PHONE
DF
42ND STREET
-- ALL DIMENSIONS AND CONDITIONS ARE -- APPROXIMATE AND SUBJECT TO FIELD VERIFICATION
NTS SCALE:
LOFFREDO BROOKS ARCHITECTS P.C. 118 WEST 22ND STREET - 4TH FLOOR
PROPOSED PLAN 21ST FLOOR
SL GREEN REALTY CORP.
EXISTING CONDITIONS ENTIRE 21ST FLOOR 14,318 RSF
FLOOR KEY: Offices Workstations
34 12
Conference Room
1 1
Reception
Total Headcount
47
PROPOSED DIVISION SUITE 2300 8,209 RSF SUITE 2305 6,086 RSF
SUITE 2300 FLOOR KEY: Offices
9
Workstations
23
IT
Conference Room
2 1 1 1
Reception
PANTRY/ COPY
COATS
ELEC. CL.
Pantry
RECEPTION
MACHINE ROOM
Suite 2300
Phone Rooms
Total Headcount
33
Suite 2305
RECEPTION
SUITE 2305 FLOOR KEY: Offices
MEN'S
4
Workstations
24
WOMEN'S
Conference Room
4 1 1 1 1
J. CL.
COPY
Reception
IT
A.D.A W.C.
W.F.
PANTRY
COATS
Pantry
BREAKOUT
Phone Rooms Breakout Room Total Headcount
39
42ND STREET
-- ALL DIMENSIONS AND CONDITIONS ARE -- APPROXIMATE AND SUBJECT TO FIELD VERIFICATION
EXISTING CONDITIONS ENTIRE 23RD FLOOR 14,295 RSF
FLOOR KEY: Offices Workstations
28 10
Conference Room
1 1 1
Reception
Pantry
Total Headcount
39
PROPOSED LAYOUT ENTIRE 27TH FLOOR 14,393 RSF
FLOOR KEY: Offices Workstations
11 44
Conference Rooms
4 4 1 1
Phone Rooms
Reception
Pantry
Total Headcount
56
EXISTING CONDITIONS ENTIRE 27TH FLOOR 14,393 RSF
FLOOR KEY: Offices Workstations
9
22
Conference Rooms
5 1 1
Reception
Pantry
Total Headcount
32
CORE AND SHELL ENTIRE 27TH FLOOR 14,393 RSF
TERRACE
PROPOSED LAYOUT ENTIRE 28TH FLOOR 13,222 RSF
FLOOR KEY: Offices Workstations
16 26
Conference Rooms
3 1 1
Reception
Pantry/IT/Storage Total Headcount
43
TERRACE
EXISTING CONDITIONS ENTIRE 28TH FLOOR 13,222 RSF
FLOOR KEY: Offices Workstations
7 3 3 1 1
Conference Rooms
Pantry
IT/Storage
Total Headcount
40
TERRACE
CORE AND SHELL ENTIRE 28TH FLOOR 13,222 RSF
PROPOSED LAYOUT ENTIRE 29TH FLOOR 13,222 RSF
FLOOR KEY: Offices Workstations
IT
23 13
PANTRY
CLOSET ELECTRIC BUILDING
Conference Rooms
5 2 6
STORAGE
COPY
Pantry
MEN'S A.D.A.
WOMEN'S A.D.A.
IT/Storage
22
D.F.
Total Headcount
37
JAN
C
MOTHER'S ROOM
MENS
A
WOMENS
1
2
3
4
5
ELEVATOR LOBBY
COATS
PHONE
PHONE
RECEPTION
EXISTING CONDITIONS ENTIRE 29TH FLOOR 13,222 RSF
FLOOR KEY: Offices Workstations
21
4 2 1 1
Conference Rooms
Pantry
IT/Storage
Total Headcount
26
EXISTING CONDITIONS SUITE 3105 6,465 RSF
FLOOR KEY: Offices Workstations
12 19
Conference Room
1 1 1 2
Receptionist
Pantry
Private Bathroom Total Headcount
32
ELEC. CLOSET
GLASS-FRONT OFFICES
AND CONFERENCE ROOMS
UPSCALE PANTRIES
Artist Rendering
HIGH-END FINISHES
Artist Rendering
STUNNING OUTDOOR SPACE
SPECTACULAR VIEWS
CLASS I C & CONVENIENT
THE LEXINGTON
AZUSA
RED STIX
VERMILION
URBANSPACE
AMMOS ESTIATORIO
BOBBY VAN’S STEAKHOUSE
BLUESTONE LANE
HOTEL MIDTOWN LODGING
SOUL CYCLE
PRET A MANGER
ELITE FOOD BAR
UN PLAZA
EQUINOX
VANDERBILT YMCA
PATROON
LA FONDA DEL SOL
ANDAZ
GRAND CENTRAL MARKET
SPARKS STEAK HOUSE
OYSTER BAR
FITZPATRICK GRAND CENTRAL
ALI BABA’S TERRACE
PERFECT PINT
PERA
SHAKE SHACK
BIERHAUS NYC
LIBRARY HOTEL
OCEAN’S ELEVEN PIZZARIA
PRET
CIPRIANI
COURTYARD
MADISON & VINE
GRAND HYATT HOTEL
OVERLOOK
THE PALM RESTAURANT
PERSHING SQUARE
DYLAN HOTEL
CAPITAL GRILLE
UNITED NATIONS APARTMENT HOTEL
HOTEL BONANZA
AMBASSADOR GRILL
Yasuda
SENIGUAL
WESTIN GRAND CENTRAL
PIETRO’S
STARBUCKS
LOCATION KEY
ZENGO
SETON HOTEL
HOTELS
MURRAY HILL EAST SUITES
HILTON
BLINK
CORE ORGANICS
RESTAURANTS
SHAKE SHACK
BUILDING SPECS
LOCATION YEAR BUILT BUILDING SIZE BUILDING HEIGHT
42nd Street between 2nd and 3rd Avenue 1930-Tower; 1959- annex and low rise addition 1,169,582 rsf Thirty-seven (37) Floors
ELEVATORS
Twenty-three (23) passenger elevators; three (3) freight elevators Loading dock located on 41st Street Water-cooled central plant system with 2,500 tons of capacity. Hours M - F 8am - 6pm, Sat 8am - 1pm
HVAC/ SUPPLEMENTAL COOLING
Supplemental condenser water available for tenant use 120/208-volt, three (3) phase service; electrical closet in floors 1-37
BUILDING CONSTRUCTION
Concrete-encased steel Facade: White and red glazed brick and mortar
ELECTRIC
Cummins diesel-fueled 520 Amp Emergency life safety generator
Lobby: Landmark lobby, including revolving 12’ globe, display of weather instruments in elegant bronze Center core Floors 2-9 64,000 - 73,000 rsf
Recently upgraded Firecom Class E System 24/7 security guards with turnstile access control CCTV surveillance throughout lobby, loading dock and entrance ways Messenger center on premises Verizon, Zayo, AT&T, Cogent Communications, Broadview Networks, Sprint, Spectrum, Teleport Communications and Level 3
LIFE/SAFETY
FLOOR LAYOUT FLOOR SIZES
Floors 10-14 50,000 rsf Floors 15-18 30,000 rsf Floors 19-33 13,000 rsf Floors 34-37 7,500-10,000 rsf Floor 2 195 lbs per rsf Floors 3-6 165 lbs per rsf Floors 7-10 50 lbs per rsf Floor 11 220 lbs per rsf Floor 12 110 lbs per rsf Floors 13-14 210 lbs per rsf Floors 15-18 110 lbs per rsf Floor 19 100 lbs per rsf Floors 20-36 60 lbs per rsf Floor 37 75 lbs per rsf 24’
SECURITY/ACCESS TELECOM/CABLE
FLOOR LOADS
TRANSPORTATION
1.5 blocks east of Grand Central Station. Easy access to the Queens-Midtown Tunnel Espresso Bar
AMENITIES
COLUMN SPACING
SUSTAINABILITY AT SL GREEN
BUILDING ACHIEVEMENTS
TENANT PARTNERSHIPS We support tenant sustainability reporting through >Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36
Made with FlippingBook flipbook maker