Data Loading...

our uniqueness

363 Views
174 Downloads
7.37 MB

Twitter Facebook LinkedIn Copy link

DOWNLOAD PDF

REPORT DMCA

RECOMMEND FLIP-BOOKS

Our Stories. Our Redmond.

TitleVI

Read online »

Our Stories. Our Redmond.

TitleVI

Read online »

our approach to branding

insights. To gather these insights we will talk to previous clients, staff and (if applicable) partn

Read online »

MHFA England - Our history

MHFA England - Our history Looking back We have an exciting 12 year history. This year we are celebr

Read online »

Our Look Book

Our Look Book beyond the sale A Look Book of Design, Staging & Renovations A well-prepared home crea

Read online »

Our Values Story

Our Values Story OUR VALUES STORY 2 OURVALUES JOURNEY | SURVEY LAUNCH SURVEY LAUNCH | OURVALUES JOUR

Read online »

Our Story 2020

Designer’s & Engineer’s. Change orders will be prepared by Tamarack North for cost forecasting purpo

Read online »

Explore Our Dining Experiences

Explore Our Dining Experiences EXPLORE OUR DINING EXPERIENCES اﻛﺘﺸﻒ ﲡﺎرب ﺗﻨﺎول اﻟﻄﻌﺎم ﻟﺪﻳﻨﺎ 4445 000

Read online »

Our Central Objective

Our Central Objective E lection Laws in Every State that Affirm and Comply with F AIR E LECTIONS A S

Read online »

Outcomes for our Community

customer and business satisfaction;  One of the lowest ‘rate in the dollar’ Cities in the State - (

Read online »

our uniqueness

ELQUATOR STAND-ALONE SMALL-HYDRO

THE UNIQUENESS OF THE SYSTEM

EASY MOBILISATION

¡ The system is a stand-alone. It can be mobilised anywhere ¡ The system does not need any rivers nor a costly dam to generate power

¡ The system is designed to produce cheaper power production as well as delivering power to remote areas with a cost-effective method ¡ The system can produce cost-effective power production

¡ With the system, the distribution of electricity to the remote areas can be better implemented

STAND ON ITS OWN

¡ The system is self-generating ¡ The first start is by using the internal power storage

¡ The initial start of the system is accomplished through a built-in storage ¡ It does not need any grid power to run the system

¡ The power produced divided into a section with one part sent out for consumption while the other is to self-powered the system

NO EXTRA RESOURCES

¡ Only requires a one-time large amount of water ¡ It replenishes in the amount of 10% of the total amount every two weeks ¡ All types of water are usable for the system to run ¡ Dirty water will be treated through a set of plant filtering before it is replenished

¡ It is the most efficient power plant that will give more return on investment as well as the cheaper power generation

ENVIRONMENTALLY FRIENDLY ¡ No dam or rivers require to supply the water to run the turbine for the generator to produce power even though it uses the same methodology as the normal hydro dam. With the little amount of water, the power can be generated around the clock all year round ¡ The system does not require a large area of land. Approximately only 1,250m2 needed for the 1MW power plant ¡ No flooding issues and no uprooting human population. The system can be mobilized to where the electricity is needed and be suited to any geographical character ¡ Use four units of 45cm Pryter impeller for energy production to send the water back to the top reservoir ¡ Water from the top reservoir travels down through seven pipelines. Each line have Pelton and generator. Water is recycled again and again

SMALL POWER TO PRODUCE MORE POWER ¡ Self-generated small energy used to power the pump ¡ A large amount of energy is produced through the Pelton

ElQuator Sdn Bhd No 15, Jalan P4/8B, Palm Industrial Park Bandar Teknologi Kajang 43500 Semenyih, Selangor MALAYSIA Tel: +6(03)8726 0207 www.elquator.com Email: [email protected]