Data Loading...
WIP Interiors Capability
5 Downloads
29.14 MB
Twitter Facebook LinkedIn Copy link
RECOMMEND FLIP-BOOKS
Ardmac Interiors UK Capability 2021
QS: IPS Value: £1m Location: About Ardmac Wrexham Live Projects Category B&C Projects Refurbishment
Interiors Newsletter Aug 2022
Interiors Newsletter Aug 2022 We’ve got News Ardmac Interiors Solutions Quarterly Newsletter Aug 202
Ryan Jones Capability Statement
Ryan Jones Capability Statement CONSULTANCY PLANNING CONSULTATION COST PLANNING CONSULTATION Buildin
ADA Capability Showcase
VirtualTour . ACCREDITED BY ETHICAL CLOTHING AUSTRALIA Did you know ADA was the first business accre
Solaire Built Capability Statement
43 Lang Parade Brisbane, QLD, 4064 [email protected] www.solairegroup.com.au
RS Instant Interiors Presentation
RS Instant Interiors Presentation space we careful ly visual ize and source perfectly fitting furnis
Ireland Interiors Brochure
Ireland Interiors Brochure Ireland Interiors ARDMAC 03 ARDMAC OVERVIEW 04 SAFETY FIRST 5 WORKING SMA
Ireland Interiors July 2022
Ireland Interiors July 2022 Ireland Interiors ARDMAC 03 ARDMAC OVERVIEW 04 WORKING SMART 06 SAFETY F
Raeco Interiors July 2021
DVD HOLDER Designed to showcase a ser ies or col lection of DVDs, these robust acr yl ic holder s ar
IE Interiors Newsletter : Apr 2022
egress requirements. The programme was fast-tracked and delivered during unprecedented times as a re
INTERIOR FITOUT & REFURBISHMENTS THE ARDMAC WAY
ARDMAC
00 CASE STUDY NAME
AS AN AWARD WINNING LEADER IN FIT-OUT AND INTERIORS, ARDMAC HAVE BEEN PROVIDING HIGH QUALITY SPACES TO FAST MOVING AND EVOLVING MARKETS SUCH AS THE COMMERCIAL, TECHNOLOGY, FINANCIAL SERVICES, HOSPITALITY, EDUCATION, AND MANUFACTURING SECTORS FOR OVER 40 YEARS. We take nothing for granted. From start to finish, we listen carefully to develop a deep understanding of your needs and vision, taking ownership of integrating design and construction. We work meticulously to create an exceptional working environment that exceeds your expectations. With a collaborative team approach, we believe that open, timely communication keeps the project moving, removes risk, and helps us all to deliver a successful result. At Ardmac we are committed to working together, sharing ideas, and taking personal responsibility for the success of every project.
2
3
CASE STUDY: Genesis Aviation
Client: Location: Size: Duration:
Genesis Aviation Cental Park, Dublin 10,000 sq.ft 12 weeks
Genesis is a leading full-service aircraft leasing company that provides innovative and tailored aircraft leasing solutions to global airline customers. Ardmac were appointed to carry out the internal fit out of the seventh floor of the newly constructed Block I within Central Park for Genesis in 2019. The new headquarters for Genesis comprises a new reception area, both cellular and open plan offices, conference and meeting rooms, a wellness room, canteen area and support spaces.
KEY FEATURES AND WORKS
Manufacturing Campus
Exposed services
Working at Height: Crane Lifts Structural Glazing & Curtain Walling
Live Environment
Live services
4
5
CASE STUDY: Mageniss
Client: Location: Size: Duration:
WIP Cental Park, Dublin 10,000 sq.ft 12 weeks
WIP
KEY FEATURES AND WORKS
Manufacturing Campus
Exposed services
Working at Height: Crane Lifts Structural Glazing & Curtain Walling
Live Environment
Live services
6
7
CASE STUDY: Whitney Moore
Client: Location: Size: Duration:
IPUT Real Estate Dublin, Ireland 14,000 sq.ft 14 weeks
A full strip and CAT B high end fit out. This incorporated the third and fourth floors at No. 2 Shelbourne Buildings in Ballsbridge, Dublin. The space was stripped out to grey box leaving only the raised access floor. All existing services and external finishes were removed and craned down from the 4th floor plant area. The new CAT B fit out comprises a reception area, a feature reception desk of Nuvolato stone with a back drop of walnut cladding, client meeting rooms, 35 one and two person offices, open plan office areas and ancillary spaces spanning 14,000 sq ft, as well as external entertaining areas. Special bespoke features are incorporated into the fit out and include high acoustic performance in all client meeting rooms and offices, consistent with the requirements of a solicitor’s practice.
KEY FEATURES AND WORKS
Manufacturing Campus
Exposed services
Working at Height: Crane Lifts Structural Glazing & Curtain Walling
Live Environment
Live services
8
9
CASE STUDY: Hilton Hotel
Client: Location: Size: Duration:
Thornmont Limited Kilmainham, Dublin 8
25 Weeks
The Hilton Hotel Kilmainham, a 4 star Hilton Hotel overlooking the Kilmainham Gaol Museum, was in need of additional bedrooms therefore Hilton decided to convert some of their meeting space and offices into bedrooms, making the Hotel into a 130 bedroom offering. Ardmac were appointed to refurbish & reconfigure the existing meeting rooms, back of house and reception to provide 10 additional bedrooms which included 1 accessible bedroom. The works also involved the relocation of comms room, luggage store and reconfiguration of back of house office at ground floor level along with the reconfiguration of 1 no existing meeting into two offices at basement level.
KEY FEATURES AND WORKS
Manufacturing Campus
Exposed services
Working at Height: Crane Lifts Structural Glazing & Curtain Walling
Live Environment
Live services
10
11
CASE STUDY: CLN3 ADMIN HALL
Client: Location: Size: Duration:
Confidential Clonee, Ireland 40,000sqft 40 Weeks
Architectural fit out of the Administration block at the new >Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34
Made with FlippingBook - professional solution for displaying marketing and sales documents online